Saturday, August 27, 2011

[MCA INFO] most network and systems offline until storm passes

Montserrat College of Art has taken its network and systems down until the storm passes.

[update: campus network and systems should be back online by 7pm]


Friday, August 19, 2011

[MCA INFO] Moodle refresh

Check out the new Moodle theme...
http://classroom.montserrat.edu
(There is also a link to Moodle on the front page of the Montserrat website)


Wednesday, August 3, 2011

[Academic Technology] Academic Spaces and IT Infrastructure


Academic Spaces
  • The classroom spaces in 238 Cabot and in 1A Knowlton will have been outfitted with their own computer and display station, composed of a mac with wireless keyboard + mouse, displayed on a 46" LCD HDTV screen that will be mobile.
  • Most lab spaces and campus Macs are having their RAM upgraded for more capable, speedier processing of programs. 
    • Areas upgraded: Design Lab, Photo Lab, Printmaking computers, Senior Photo Lab, Senior Design Lab, Writing Center, Library, 301 Cabot, and various Mac Minis.
  • Senior Illustration (H307) is being outfitted with two new iMac computers.
  • 301 Cabot is getting it's own laptop+projector for classroom use.
  • An enterprise anti-virus and monitoring system is being put on all on-campus Mac computers.
  • New software is being rolled out to the Animation and Graphic Design labs.
    • Animation Lab: After Effects, Unity 3D Pro
      Senior Graphic Design: Fontlab Studio
  • Although we are excited about the new OS X Lion Operating System, we don't think it is quite ready to roll-out to the Montserrat Community. We are sticking with Snow Leopard for now.
IT Infrastructure/Overall
  • A new, high-end Mac Pro Server has been purchased to handle core computer lab services such as data and account services management:
    • Increased performance
    • Improved redundancy
    • Increased storage capacity
  • The new campus wireless network has been optimized and is ready for full, consistent use come the start of this school year.
  • The Google Apps Suite has been rolled out to all faculty, students and staff. Options for collaboration and cloud-based work have never been more numerous.
Write up courtesy of Brett Johnson

[MCA Project] Campus Network scheduled downtime on Friday at 1:30pm

The campus network will be down for about 30 minutes beginning at 1:30pm on Friday August 5th.

The following devices and services will be unavailable:
  • computers
  • phones
  • servers
  • internet
  • printers
The reason for this scheduled downtime is to move DNS and DHCP from a standalone Linux server to a virtualized instance of MS Server 2008 R2.